    Kazuba™ Installation Overview

    Permanent system installations (in-ground)

    All permanent Kazuba™ STK and KL-series installations are included in the system package and managed by WCTNZ®, ensuring that quality controls are maintained for optimal long-term performance.

    The installation process is similar to that of a small underground tank, with foundation and backfill provided for tank stability. A high-quality concrete slab is poured over the dry toilet tank, and after a few days of curing,

    the superstructure is assembled, followed by final surface treatments and furniture fitting. This complete service is provided by our team of experts, ensuring a seamless and professional installation.

    Re-locatable system installations (on-ground)

    Kaab™ Kazuba™ Bumper systems are cost-effective, fast-deployable units, making them ideal for multi-site toilet locations or areas where an organization or council needs distant toilets to accommodate patrons.

    These systems are professionally installed by WCTNZ® to ensure proper operation and compliance with all parameters, including solar power requirements and optimal evaporative function, achieved through best-practice placement.

    When relocation of the toilet facility is required, WCTNZ's® crew can quickly move your buildings to their new location for continued use. This relocation service includes a building treatment and inspection to ensure everything is in top condition.

    Trust our team to get it right for you—order your set of Kazubas™ today.

     