Clivus Multrum™ | CM HP (High-Profile)
The Clivus Multrum™ CM HP system is designing to meet the larger capacity requirement of a few users to a family unit with a chamber (tank) underfloor-clearance requirement of 750mm
Choose the Product options below
*Please select the primary pedestal (toilet fixture) option you would like to accompany your composting system.
Note; that the Urine-Diversion (UD) pedestal option is most suitable where there is high use in peek or large family gatherings.
Note; that with Urine Diversion, it is recommended that the compost mass is kept wet to avoid the pile drying out. Consider getting the hand-held bidet sprayer accessory for facilitating the hydration of compost.
A hardwearing Nano-Ceramic Non-Stick Coating is applied onto the inner side of the Pedestal (toilet fixture) for maximum cleanliness.
Note; basic cleaning will still be required.
Note; non-stick is hydrophobic and repels liquids only.
If your user rating is higher than the capacity of the system choose additional chambers.
Choose additional chambers to increase the capacity of your system or to provide longer composting times where needed.
Choose additional heating to speed up or maintain the composting process or for colder climates (100watts @ 12 Volts DC)
For direct solar-powered options Use one 150 Watt Solar Panel (PV) with a 10amp Solar Controller. Use an on-off switch when heating is not desired.
Use a 150 Watt transformer (240 Volt AC to 12 Volt DC) supply to power your Heating Element Option
Use a 150 Watt transformer (240 Volt AC to 12 Volt DC) supply to power your Heating Element Option
If the underfloor height exceeds 1200mm (floor-to-floor), you will require additional lengths of the chute.
*Choose the fan voltage to match your power system. (Add additional fan units for replacement parts).
All ELV (Extra Low Voltage) (12v-48V) are suitable for Off-grid power systems.
Vent stack kit for installation.
In residential applications, a vertical vent must extend 0.6m above the roofline - this is a code requirement.
*You may need additional vent materials depending on how many storeys your building has.
Single Storey buildings with a high-profile roof (A frame or mono-pitch) require extra lengths of vent pipe - add one 830mm Vent Pipe Extension
Double Storey buildings require extra lengths of vent pipe. Please add 4 x 1m Vent Pipe Extensions.
Double Storey building with a high-profile roof (A frame or mono-pitch) require extra lengths of vent pipe - add one 830mm Vent Pipe Extension
Kit for stepping the vent stack around the eaves of the roof. Allows you to avoid penetrating the roof.
Add a wind-driven vent to create redundancy. The wind-driven vent will assist the fan under heavy wind conditions and keep the system going in case of power outage or fan failure.
Please choose from 2 colours: white or black.
Select this reducing collar to adapt the wind-driven vent from 150mm to 100mm.
Select this reducing collar to adapt the wind-driven vent from 150mm to 100mm.
Extend your soft connection leachate drainpipe to reach your hard connection leachate drainpipe or soak-pit/trench.
Soft connections allow for flexible placement of the composting tank in relation to a hard connection or drain.
The system is packed with 1 meter of 25mm leachate drainpipe as a standard.
Extend your leachate drain via in-ground hard connection to reach your soak-pit/trench (soak-away).
Most soak-aways should be installed 3 meters away from the foundations of the structure but this remains circumstantial to the site.
Run your leachate drain into a soak pit (vertical soak-away) or into a trench (horizontal soak-away).
$4,256.52 excl GST
excluding shipping
Dispatch; Transport Time Frames: 1 Week Estimated Time of Freight (Nationwide-Transport)
Products